Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:49:19 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: ITMA(P)
Work Code: 1703004005/RS/22012034359544 (U SEP NALA NIRMAN UTAM KE MAKAN SE KENAL .AGNDAVI SE VISHVANATH KE MAKAN .BREJMOHAN SE PURANE NALE)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/5/2017 Work start date : 27/6/2017
Present status : Existing Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 005/193 Sanction Date : 21/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
562147 288683 0 0 0 0 0 289000 0 850830
Financial Sanction Details
Financial\Administrative Sanction No: 005/28 Financial\Administrative Sanction Date 27/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:850530 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
851000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises1.817503150
2Dag-beling-Double spade "v" shaped stroke 100mm deep7000.5350
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)78.752202.3173431.125
4Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.315211.466591
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.157.51858.7292745.25
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing385127.649126
7Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size70.88355.825219.104
8Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil393.759537406.25
9Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Other than black trap Basalt or granite157.5556.987711.75
10contingency1114530114530
Total Activity 851000
S.NoMaterialQuantityUnit PriceTotal
120mm metal13.391196.916026.491
240 MM Metal supply70.88288.720463.056
3Cement500.98270135264.6
4Contengency17183.547183.54
5Khanda Praday157.5404.1863658.35
6SANT48.16950.5145776.5616
Total Material 289000