S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2295 | 1.6 | 3672 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 5100 | 4.1 | 20910 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1090 | 81.2 | 88508 |
4 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 361.24 | 89.6 | 32367.104 |
5 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 438.11 | 91.3 | 39999.443 |
6 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 15.38 | 88.3 | 1358.054 |
7 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 6.75 | 105 | 708.75 |
8 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 2550 | 0.5 | 1275 |
9 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 3.36 | 145.4 | 488.544 |
10 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 2.7 | 3177.8 | 8580.06 |
11 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 31.49 | 2478.2 | 78038.518 |
12 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 2.7 | 118.6 | 320.22 |
13 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 70.04 | 199.7 | 13986.988 |
14 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 2465 | 118.8 | 292842 |
15 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 270.95 | 156.98 | 42533.731 |
16 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 2465 | 120.69 | 297500.85 |
17 | Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia. | 13.5 | 593.95 | 8018.325 |
18 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 2465 | 23.6 | 58174 |
19 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 13.5 | 2295.5 | 30989.25 |
20 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1090 | 19.1 | 20819 |
21 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 2465 | 23.7 | 58420.5 |
22 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 382.5 | 721.7 | 276050.25 |
23 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 191.2 | 349.1 | 66747.92 |
24 | work charge | 1 | 48000 | 48000 |