State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DEVRIKALA(P)
Work Code: 1703004033/RC/22012034188017 (खरंजा निर्माण मरघट से ताल के हैण्‍ड पम्‍प तक)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 3/10/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 33/1658 Sanction Date : 6/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
95958.7 44826.6 0 0 0 0 0 44900 0 140785.3
Financial Sanction Details
Financial\Administrative Sanction No: 33/13 Financial\Administrative Sanction Date 15/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:140785 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
141000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep2000.240
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick218.614030604
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.215.730064710
4Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.132.8469.929288.1728
5Loading of metal in truck, dumper etc.26.2869.921837.4976
6Unloading of metal in truck, dumper etc.13.1469.92918.7488
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.4169.922866.72
8Collection of hard moorum including stacking at quarry.130.869.929145.536
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.12137421374
Total Activity 141000
S.NoMaterialQuantityUnit PriceTotal
1CESS7339.8617339.86
2Transporation of Boulder206.64459298.8
3खण्‍डा परिवहन111
4फर्सी13514018900
5मुरम परिवहन (1)132.8469.929288.1728
Total Material 44900