State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/IF/9926731723 (KAPILDHARA KOOP NIRMAN HARPRASAD s/o LAXMAN PATEL)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/1/2014 Work start date : 2/3/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1763 Sanction Date : 28/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
169000 167000 0 0 0 0 0 167000 0 336000
Financial Sanction Details
Financial\Administrative Sanction No: 19/c Financial\Administrative Sanction Date 1/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:336000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
336000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11467014670
3Work charge12500025000
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead365.2221.97998.318
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)22.243375.475068.896
6Add extra for labour only for additional floor or 6.m height and part thereof PCC or RCC work in item no.042618.4283.221532.9124
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift437.9223.898002.02
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars482.9654.426273.024
9Transportation of metal 12.3153.81891.74
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.10.7176.871892.509
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.5.02320.221607.5044
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.7490.12048.874
13Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m.6.84137.3939.132
14Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m.6.84144.4987.696
15Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m.6.84151.51036.26
16Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m.4.74158.6751.764
17Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m.000
18Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m.4.74165.7785.418
19Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m.4.74172.8819.072
20Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m.4.74179.9852.726
21Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m.4.74187886.38
22Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m.000
23Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m.000
24Earth work for well excavation-Hard rock requiring blasting lift from 5.50 m. to 6.00 m.4.74572.62714.124
25Earth work for well excavation-Hard rock requiring blasting lift from 6.00 m. to 6.50 m.4.74585.52775.27
26Earth work for well excavation-Hard rock requiring blasting lift from 6.50 m. to 7.00 m.4.74598.42836.416
27Earth work for well excavation-Hard rock requiring blasting lift from 7.00 m. to 7.50 m.000
28Earth work for well excavation-Hard rock requiring blasting lift from 7.50m. to 8.00 m.4.74624.22958.708
29Earth work for well excavation-Hard rock requiring blasting lift from 8.00 m. to 8.50 m.4.74637.13019.854
30Earth work for well excavation-Hard rock requiring blasting lift from 10.50 m. to 11.00 m.4.74705.33343.122
31Earth work for well excavation-Hard rock requiring blasting lift from 8.50 m. to 9.00 m.4.746503081
32Earth work for well excavation-Hard rock requiring blasting lift from 9.00 m. to 9.50 m.4.74662.93142.146
33Earth work for well excavation-Hard rock requiring blasting lift from 9.50 m. to 10.00 m.4.74675.83203.292
34Earth work for well excavation-Hard rock requiring blasting lift from 10.00 m. to 10.50 m.4.74688.73264.438
35Earth work for well excavation-Hard rock requiring blasting lift from 11.00 m. to 11.50 m.4.74721.93421.806
36Earth work for well excavation- Hard rock requiring blasting lift from 11.50 m. to 12.00 m4.74738.53500.49
37Earth work for well excavation-Hard rock requiring blasting lift from 12.00 m. to 12.50 m.4.74755.13579.174
38Earth work for well excavation-Hard rock requiring blasting lift from 12.50 m. to 13.00 m.4.74771.73657.858
39Earth work for well excavation- Hard rock requiring blasting lift from 13.00 m. to 13.50 m.4.74788.33736.542
40Earth work for well excavation-Hard rock requiring blasting lift from 13.50 m. to 14.00 m.4.74804.93815.226
41Earth work for well excavation-Hard rock requiring blasting lift from 14.00 m. to 14.50 m.4.74821.53893.91
42Earth work for well excavation-Hard rock requiring blasting lift from 14.50 m. to 15.00 m.4.74838.13972.594
43Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil15.389.61370.88
44Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum15.3100.81542.24
45Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)12.33764624.8
46Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.12.3100.31233.69
47Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.16.3139.12267.33
Total Activity 336000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL16.58120019896
2Cement(bori)10030030000
3Centering and Shuttering312.9390.128194.993
4CONTANGANCY190009000
5desal pump rent180008000
6IRON SARIYA520.2254.428299.968
7MASON (PERDAY)6130018300
8Sand14.07135018994.5
9Transpotation Charges160006000
Total Material 167000