Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:35:14 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KACHPURA
Work Code: 1702001003/RC/22012034321496 (C.C.Raod Hakim Ke Makan Se Murali Kushwah Ke Makan ki Or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 15/2/2016
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 294/478 Sanction Date : 7/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Performance Grant scheme2 scheme3 Total
57000 38000 0 0 200000 0 0 238000 0 295000
Financial Sanction Details
Financial\Administrative Sanction No: 478/294 Financial\Administrative Sanction Date 11/2/2016
Fin. Sanc. Amt. (in Rs) NREGA:95000 Performance Grant
200000
Scheme 2
0
Scheme 3
0
Total
295000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep3000.5150
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.45.9638.829320.92
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)50.843067.2155936.448
5False work for R.C.C. and P.C.C. work in plinth and foundation551297095
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)1156.2713
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 29.496.4188.736
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 32.6434.41122.816
9Transportation of 20 MM metal35.16703.124720.996
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13200032000
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.44.4987.33883.977
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work45.988.44057.56
13contingency13300033000
Total Activity 295000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)13129037990
2Convergence Amount1200000200000
Total Material 238000