S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 435 | 0.4 | 174 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 98.6 | 32.4 | 3194.64 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 69.96 | 2846.06 | 199110.3576 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 52.72 | 2250.09 | 118624.7448 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 69.96 | 149.2 | 10438.032 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 261.58 | 132.3 | 34607.034 |
7 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 427.75 | 6 | 2566.5 |
8 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 98.6 | 8.2 | 808.52 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 122.68 | 36.2 | 4441.016 |
10 | Transportation of 20 MM metal | 108.9 | 300.6 | 32735.34 |
11 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 152.97 | 128.07 | 19590.8679 |
12 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 23.2 | 280.08 | 6497.856 |
13 | Loading of metal in truck, dumper etc. | 98.6 | 23.11 | 2278.646 |
14 | Unloading of metal in truck, dumper etc. | 98.6 | 11.88 | 1171.368 |
15 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 281.3 | 73.4 | 20647.42 |
16 | Collection of hard moorum including stacking at quarry. | 98.6 | 118.3 | 11664.38 |
17 | SIGN BOARD | 1 | 2000 | 2000 |