Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:16:22 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: NIHALWADI
Work Code: 1725006037/WC/22012034431144 (NWC चेकडेम निर्माण कार्य दडपाया नाला क्र 2)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 9/1/2019
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 207/AA Sanction Date : 4/1/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
148000 295000 0 0 0 0 0 295000 0 443000
Financial Sanction Details
Financial\Administrative Sanction No: 27/BB Financial\Administrative Sanction Date 5/1/2019
Fin. Sanc. Amt. (in Rs) NREGA:443000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
443000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises1353405
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)94.15369.534788.425
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)114.222562.8292723.016
4Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size.12.61939.824441.48
5False work for R.C.C. and P.C.C. work in plinth and foundation223.4155.334694.02
6Transportation of metal 115.6616919546.54
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.77.11152.111728.431
8Lossening of hard soil by ploughing the existing gound36.212.797.767
9Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed36.21501810.5
10work charge122587.0722587.07
Total Activity 443000
S.NoMaterialQuantityUnit PriceTotal
140 mm size HG metal400112.7845112
2CEMENT555300166500
3Centring & Shuttering223.466.214789.08
4Conten. 211165211652
5Display board115001500
6Loosening Machine Rent36.212.797.767
7Sand57.8345026023.5
8Transportation charges of mate57.83152.18795.943
9Transportation of Soft Rock115.6616919546.54
Total Material 295000