State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Aamkho
Work Code: 1722005067/WC/22012035030149 (amrut sarovar talab bhasing ke khet ke pass movdipura aamkho )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2022 Work start date : 23/12/2022
Present status : Non-existent Proposed Status : Construction of Embankment for community
Tech Sanction Details
Technical Sanction No. : 1722005/2022-2023/5533/TS Sanction Date : 12/1/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
888881.2 502801.25 21020.2 7814.62 0 0 0 532000 0 1420517.27
Financial Sanction Details
Financial\Administrative Sanction No: 1722005/2022-2023/5533/AS Financial\Administrative Sanction Date 12/1/2023
Fin. Sanc. Amt. (in Rs) NREGA:1420515 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1421000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(a) Other then black trap Basalt or granite99.48315.1643546441531352.55
2(a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work)23102.524502164502165831.6
3(j) 5.0 Km. Lead84.77188.33207502654215964.91
4(b) 1.0 Km. Lead444.22113.50855431993250422.77
5(d) 2.0 Km. Lead666.33132.8725406330288536.96
6(g) 3.5 Km. Lead1020.37161.163225104619164446.12
7(VI) 3.0 Km. Lead99.48169.58544431041416870.36
8Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.365025.152443835616491806.42
9(c) Metal 40 mm nominal size60.68852.58503625576851734.86
10(a) Boulders69.47603.72506117748741940.78
11For earthen dam - puddle filling of good clay ( excluding cost of puddle earth & Water) including mixing, kneading by tamping , ramming & laying etc.280259.33572613.8
12Site clearance, cutting grass, raking into heaps and removing off the premises1652.962.818912738360274659.55
13a (iii) Loose or soft soil for Tank Work88.54106.730743166939449.94
14b (iii) Dense or hard soil for Tank Work1040.01144.075008894145149839.45
15c (iii) Hard moorum for Tank Work1356.88191.907899003596260395.99
16a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work353.59611.771854407647216316.41
17Collection of puddle earth including stacking at quarry280194.55889285714354476.49
18Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.84.77241.12386457473220440.07
1922cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum99.48430.39435062324142815.63
Total Activity 1390000
S.NoMaterialQuantityUnit PriceTotal
10038-Tractor with ripper attachment5.0005252012601.26
20055-Smooth Wheeled Roller 8 to 10 tonne52.19523612318.02
30057-Water Tanker 5 to 6 KL Capacity731208760
40084-Hire charges of Diesel truck - 9 tonne (without POL)75.741613542100159057.388434
510-Miscellaneous /Contingencies charges12700027000
61158-Stone for pitching 15 cm x 22.5 cm29.84445013429.8
71235-Diesel oil579.9393107210057993.931072
83-Display Board / CIB136003600
95001-Mobil oil20.709408392705591.5402653
10MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT60.6852531857
11MR6034-Blaster (Semi-Skilled)0.9948351349.1748
12MR6035-Gelatine (80%)18.901265.61239.91872
13MR6036-Electric detonator99.4816.41631.472
14MR6037-Fuse coil (10m long)29.8448.2244.7208
15MR6038-Drilling of holes 25mm dia 0.75m deep74.6161.514589.2611
16MR6039-Water4380000.0521900
17MR6101-Boulder - picked up (1807)69.4714710212.09
Total Material 373000