S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 200 | 6.64 | 1328 |
2 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 16.87 | 317.76 | 5360.6112 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 13 | 3175.78 | 41285.14 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 13.5 | 172 | 2322 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 240 | 74.76 | 17942.4 |
6 | Transportation of metal | 10.33 | 174.89 | 1806.6137 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 7.16 | 289.37 | 2071.8892 |
8 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 945 | 148.33 | 140171.85 |
9 | work charge | 1 | 18711.49 | 18711.49 |