State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PURABANWAR(P)
Work Code: 1703004045/DP/9926697447 (वनग्राम पुराबनवार)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 9/8/2013
Present status : Not Exist Proposed Status : Plantation
Tech Sanction Details
Technical Sanction No. : 45/89 Sanction Date : 2/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1680010 930130 0 0 0 0 0 931000 0 2610140
Financial Sanction Details
Financial\Administrative Sanction No: 45/1066 Financial\Administrative Sanction Date 8/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:2610140 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2611000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum1166.490.4105442.56
2Dag-beling-Single spade stroke minimum 75mm deep243700.24874
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.0.99145.4143.946
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)3.682010.47398.272
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal)0.661787.41179.684
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1.3231794196.28
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift13.2165.82188.56
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)5.511645.39065.603
9Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)12.312511.130911.641
10Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)0.81752414.61973.9355
11Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.32855.318138.4
12Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars82.8954.34500.927
1315mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)104.1486.69018.524
14Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick.27.62075713.2
15Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface.64.910.1655.49
16Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats3.2435.1113.724
17Transportation rates for Masonry stone.5.51204.011124.0951
18Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.13.137177.42330.5038
19Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.9.57449.484301.5236
20Providing and fixing to wall ceiling and floor galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings and clamps including walling making good the wall, ceiling and floor-15 mm dia.12785.710883.9
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil11.3488.31001.322
22contingency18531785317
23Cement concrete Fancing Pole of 1.8 Meter length as per MPLUN specfication.28821060480
24Transporation of cement concrete pole including loading and unloading upto 40 km. from block head quarter.5.184319.91658.3616
25Barbed wire of 12 gauge as per MPLUN/ MPAGRO specification.45080.2336103.5
26Digging of pits.for fencing pole and fitting work 0.30X0.30X0.45=0.0405 per pole268102680
27Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete.54001054000
28All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.2920146426320
29All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants.2920146426320
30All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants.2190146319740
31All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fourth year per 1350 plants.1460146213160
32All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fifth year per 2300 plants.730146106580
33Supply of farm yard mannure (FYM) to the plantation site.54007.540500
34Transportation of fertile soil with in 5 km range from plantation site for filling in diging pits quantity will we 1/4 of pit size each pit.54005.8931806
35Supply of vermi compost5400527000
36Supply of singal super phosphate (SSP)13506.68910
37Supply of muriate of potash (MOP)67517.812015
38Supply of urea.67564050
39Supply of Neem cake10802021600
40Supply of Themate, phorate 10 G pesticites135597965
41Supply of foresty or horticulture Plant cost graffted 2 to 3 feet . height72042880
42Supply of foresty or horticulture Plant cost 3 to5 feet . height576030172800
43Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant.108002.527000
44Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.801500120000
45Consumption of Diesel or monthly electic bill for Irrgation of plantation area per hect.801500120000
46Supply of Pvc pipe line 63mmX4kg/cm24504821600
47Supply of HDP legam pipe 1 Inch500157500
48Supply of farm yard mannure (FYM) and fartilizer second year per plant5400527000
Total Activity 2611000
S.NoMaterialQuantityUnit PriceTotal
110 mm steel 1082554510
220 M.M. METAL2.310002300
340 M.M. METAL65503300
4BAMBOO401004000
5BARBED WIRE 145080.2336103.5
6BINDING WIRE 7820701400
7CEMENT(BEGS)7027018900
8contigency18826688266
9DIESAL 46.2092.157.36120002.856
10Display board140004000
11Fartilizer (Gobar Khad)54007.540500
12Fartilizer (Potash)6.75178012015
13Fertilizer5400527000
14First Aid Box1500500
15IRON GATE 232856.9518679.6
16Neem Khali10802021600
17P V C PIPE 24504821600
18PASTTICIED & COMPSED108002.527000
19photocopy page........150011500
20Photograph50301500
21Plant576030172800
22Plant (2)72042880
23R.C.C. fencing poles28821060480
24R.R. stone (other than granite5.510505775
25Sand10.92100010920
26SPRINKLE PIPE5500157500
27STATIONARY......114961496
28Temporary shed120002000
29Transportation charges5.184319.91658.3616
30Transportation Of Material1191.16191.16
31Transpotation Charges400300120000
32Urea13.53004050
33उपजाऊ मि‍टटी परि‍वहन30530.115903
34पौधा परि‍वहन 6480425920
35फोरेट135597965
36वर्मी कम्‍पोस्‍ट5400527000
37सिंगल सुपर फास्‍फेट13506.68910
Total Material 931000