S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 1166.4 | 90.4 | 105442.56 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 24370 | 0.2 | 4874 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 0.99 | 145.4 | 143.946 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 3.68 | 2010.4 | 7398.272 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal) | 0.66 | 1787.4 | 1179.684 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 1.32 | 3179 | 4196.28 |
7 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 13.2 | 165.8 | 2188.56 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 5.51 | 1645.3 | 9065.603 |
9 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 12.31 | 2511.1 | 30911.641 |
10 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand) | 0.8175 | 2414.6 | 1973.9355 |
11 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 328 | 55.3 | 18138.4 |
12 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 82.89 | 54.3 | 4500.927 |
13 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 104.14 | 86.6 | 9018.524 |
14 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick. | 27.6 | 207 | 5713.2 |
15 | Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface. | 64.9 | 10.1 | 655.49 |
16 | Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats | 3.24 | 35.1 | 113.724 |
17 | Transportation rates for Masonry stone. | 5.51 | 204.01 | 1124.0951 |
18 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 13.137 | 177.4 | 2330.5038 |
19 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 9.57 | 449.48 | 4301.5236 |
20 | Providing and fixing to wall ceiling and floor galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings and clamps including walling making good the wall, ceiling and floor-15 mm dia. | 127 | 85.7 | 10883.9 |
21 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 11.34 | 88.3 | 1001.322 |
22 | contingency | 1 | 85317 | 85317 |
23 | Cement concrete Fancing Pole of 1.8 Meter length as per MPLUN specfication. | 288 | 210 | 60480 |
24 | Transporation of cement concrete pole including loading and unloading upto 40 km. from block head quarter. | 5.184 | 319.9 | 1658.3616 |
25 | Barbed wire of 12 gauge as per MPLUN/ MPAGRO specification. | 450 | 80.23 | 36103.5 |
26 | Digging of pits.for fencing pole and fitting work 0.30X0.30X0.45=0.0405 per pole | 268 | 10 | 2680 |
27 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 5400 | 10 | 54000 |
28 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 2920 | 146 | 426320 |
29 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants. | 2920 | 146 | 426320 |
30 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants. | 2190 | 146 | 319740 |
31 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fourth year per 1350 plants. | 1460 | 146 | 213160 |
32 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fifth year per 2300 plants. | 730 | 146 | 106580 |
33 | Supply of farm yard mannure (FYM) to the plantation site. | 5400 | 7.5 | 40500 |
34 | Transportation of fertile soil with in 5 km range from plantation site for filling in diging pits quantity will we 1/4 of pit size each pit. | 5400 | 5.89 | 31806 |
35 | Supply of vermi compost | 5400 | 5 | 27000 |
36 | Supply of singal super phosphate (SSP) | 1350 | 6.6 | 8910 |
37 | Supply of muriate of potash (MOP) | 675 | 17.8 | 12015 |
38 | Supply of urea. | 675 | 6 | 4050 |
39 | Supply of Neem cake | 1080 | 20 | 21600 |
40 | Supply of Themate, phorate 10 G pesticites | 135 | 59 | 7965 |
41 | Supply of foresty or horticulture Plant cost graffted 2 to 3 feet . height | 720 | 4 | 2880 |
42 | Supply of foresty or horticulture Plant cost 3 to5 feet . height | 5760 | 30 | 172800 |
43 | Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant. | 10800 | 2.5 | 27000 |
44 | Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day. | 80 | 1500 | 120000 |
45 | Consumption of Diesel or monthly electic bill for Irrgation of plantation area per hect. | 80 | 1500 | 120000 |
46 | Supply of Pvc pipe line 63mmX4kg/cm2 | 450 | 48 | 21600 |
47 | Supply of HDP legam pipe 1 Inch | 500 | 15 | 7500 |
48 | Supply of farm yard mannure (FYM) and fartilizer second year per plant | 5400 | 5 | 27000 |