State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/22012034513411 (aproch rod govt. asptal se sanichra bajar phunch marg barha bada)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2019 Work start date : 20/2/2020
Present status : Earthern road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1734004/2019-2020/20646/TS Sanction Date : 12/2/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
82433.81 103619.14 71.93 436.6 0 0 0 105000 30000 216561.48
Financial Sanction Details
Financial\Administrative Sanction No: 1734004/2019-2020/20646/AS Financial\Administrative Sanction Date 12/2/2020
Fin. Sanc. Amt. (in Rs) NREGA:216848 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
217000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.9006.059911111111115453.92
2(a) Moorum or sand116.4422.37358296118172605.18
3(a) Puddle earth, sand or kankar337.515.65185185185195282.5
4(X) 5.0 Km. Lead116.44148.83407763655117330.24
5(IV) 2.0 Km. Lead337.5108.56444444444436640.5
6(a) For minimun soacked CBR Value of 2078.75399.41104761904831453.62
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.18917.25656084656083261.49
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.337.518.93460740740746390.43
9Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), as per clause 407 of specifications for rural roads(MORD), i/c required leads and lifts of materials etc. complete.116.4435.11937478529724089.3
10"Construction of Gravel Surface Course as per clause 402 of "Ministry of Rural Development, Specifications for Rural Roads-August, 2004" by an appropriate combination of natural gravel, river borne material and crushed metal in required proportions confirming to Grading requirements specified in clause 2.2.2.2 or clause 2.2.2.3 (Table 2.3, Material having Nominal Maximum Size 20 mm or 10 mm) of IRC:SP:77-2008, having Liquid Limit less than 40 and Plasticity Index 6-15 and strength of material not less than 20% CBR, including all leads and lifts of material etc. complete. The mixing shall be by Mix-in-Place method over prepared surface, spreading in uniform layers with tractor mounted grader or manually, watering at OMC and compaction by smooth wheeled/vibratory roller of 80 to 100 kN static weight to achieve 100% of MDD as per IS:2720 (Part-7)".22.5467.72577777777810523.83
11Collection of approved soil having CBR not less then 12, including stacking at quarry.116.44192.91025420817622462.47
12Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.526.53.600170940170941895.49
13Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.526.568.240702754036135928.73
14Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13530.013530.01
Total Activity 187000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20038-Tractor with ripper attachment1.809721243843.8028
30055-Smooth Wheeled Roller 8 to 10 tonne19.64252364635.63
40057-Water Tanker 5 to 6 KL Capacity14.15811181670.6558
50084-Hire charges of Diesel truck - 9 tonne (without POL)13.4175224230082.035
60296-Stone Aggregate(single size): 12.5 mm nominal size5.175797.444126.752
70367-Portland Cement0.02895511159.2679
80368-White cement 0.0004157446.2976
90983-Fine sand (zone IV)0.0471076.2550.58375
101235-Diesel oil106.6355687251.214
115001-Mobil oil3.8127182.9697.34283
127900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
139-Quality control and Survey13000030000
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
15MR6032-Snowcem/ durocem0.00072778919.4523
16MR6039-Water84948.80.054247.44
17MR6051-Tractor with rotavator4.05210850.5
18MR6052-Hard moorum20.71893912.3
19MR6056-Well Graded granular material (For Gravel Road)94.5246.1923264.955
20MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
21MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver2.36927081677.3936
Total Material 118000