S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Transportation of metal | 51.78 | 174.8 | 9051.144 |
2 | Labour only for boulder soling hand packed excluding consolidation. | 51.78 | 96 | 4970.88 |
3 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 36.02 | 91.1 | 3281.422 |
4 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 51.78 | 90.7 | 4696.446 |
5 | Earth work in excavation in Ordinary soil including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site. | 0 | 0 | 0 |