S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 500 | 500 |
2 | Contingency | 1 | 1923 | 1923 |
3 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 240.47 | 6.4 | 1539.008 |
4 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 18 | 212.1 | 3817.8 |
5 | Lossening of hard soil by ploughing the existing gound | 687.28 | 2.7 | 1855.656 |
6 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 687.28 | 50 | 34364 |