S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 12569 | 3 | 37707 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 7.72 | 2562.5 | 19782.5 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 666 | 165 | 109890 |
4 | Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand) | 5.5 | 2562.5 | 14093.75 |
5 | Transportation of metal | 2010 | 172 | 345720 |
6 | Providing laying and compacting of W.B.M. sub base/ base course including preparation and compaction of sub base and spreading of clean and crushed aggregate to proper grade and camber including application of screenings for interlocking, sprinkling of wa-Grading No. 1 Material, (90 to 45mm size) with moorum as screening | 250 | 0 | 0 |
7 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 500 | 474.6 | 237300 |
8 | Collection of puddle earth including stacking at quarry | 285.3 | 574.6 | 163933.38 |
9 | Lossening of hard soil by ploughing the existing gound | 1320.78 | 52.7 | 69605.106 |
10 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 2728.06 | 183.16 | 499671.4696 |