Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:25:54 AM 
Back  
State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: DHARMPURI
Work Code: 1724008022/WC/22012034422958 (nistar talab nirman pujara falya)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 7/6/2018 Work start date : 7/8/2018
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 6 4 Sanction Date : 11/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
798000 700000 0 0 0 0 0 700000 0 1498000
Financial Sanction Details
Financial\Administrative Sanction No: 6 2018-19 Financial\Administrative Sanction Date 12/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:1498000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises12569337707
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)7.722562.519782.5
322cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014666165109890
4Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand)5.52562.514093.75
5Transportation of metal 2010172345720
6Providing laying and compacting of W.B.M. sub base/ base course including preparation and compaction of sub base and spreading of clean and crushed aggregate to proper grade and camber including application of screenings for interlocking, sprinkling of wa-Grading No. 1 Material, (90 to 45mm size) with moorum as screening25000
7FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.500474.6237300
8Collection of puddle earth including stacking at quarry285.3574.6163933.38
9Lossening of hard soil by ploughing the existing gound1320.7852.769605.106
10Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed2728.06183.16499671.4696
Total Activity 1498000
S.NoMaterialQuantityUnit PriceTotal
122 CM Piching Bolder Supplyes6666643956
2Benching : Hard Soil25025.256312.5
3Boulder Transportation258.3230.259460.66
4Hearting Soil2010.0968.98138656.0082
5Lead of Casing Soil 0.50 Km2892.5773.26211909.6782
6Lead of Casing Soil 3.50 Km000
7Lead of Hearting Soil201066132660
8pitching stone lead 20 km152230.234990.4
9Soil transport000
10Soil Transportation000
11Stone Chips Supplyrs 000
12Transpotation Charges000
13Transpotation of Puddle Earth500143.571750
14WRD 418 - Labour for Watering 000
Total Material 700000