The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 03:31:24 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BILLOD MAL
Work Code: 1725001006/RC/22012034175699 (सी सी रोड निर्माण कार्य सह नाली निर्माण कार्य दशरथ)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 1/8/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 064/2013 Sanction Date : 2/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
120000 81000 0 0 299000 0 0 380000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 027/2013 Financial\Administrative Sanction Date 8/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:201000 Panchparmeshwar
299000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep3750.5187.5
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)104.993478.5365207.715
3False work for R.C.C. and P.C.C. work in plinth and foundation280.25154.243214.55
4Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)3696.32324.7
5Collection of approved soil having CBR not less than 5, including stacking at quarry.80.3312610121.58
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 80.336481.98
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 102.94323294.08
8Transportation of metal 80.33107.648646.7212
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.23.1193.054459.455
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.89.24214.519141.98
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.000
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.45.15193.058716.2075
13Site clearance, cutting grass, raking into heaps and removing off the premises76.597.77474.05
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work266.1297.725999.924
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL80.3195076294.5
2CEMENT(BEGS)645300193500
3Centring & Shuttering1627512150
4Display board120002000
5mixer machin (perday)10100010000
6PhotoCopy & Stationary1893893
7sand cum51.92110057112
8Vibrator201002000
9Water With Tenkar11400014000
10बोर्ड000
11मुरम80.3315012049.5
Total Material 380000