S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 3600 | 0.5 | 1800 |
2 | Contingency | 1 | 11764 | 11764 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 1500 | 0.2 | 300 |
4 | Labour only for item no.1106 | 1 | 19730 | 19730 |
5 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 236.25 | 229.54 | 54228.825 |
6 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2729.25 | 4.8 | 13100.4 |
7 | Transportation of metal | 715.5 | 66.06 | 47265.93 |
8 | Korebandi for consolidation work.-30cm wide and 10cm thick. | 1000 | 1.9 | 1900 |
9 | Laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1200 mm dia. | 22.5 | 772.4 | 17379 |
10 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 2493 | 18.54 | 46220.22 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 2493 | 67.8 | 169025.4 |
12 | SIGN BOARD | 1 | 1500 | 1500 |
13 | Labour difference in case of old SoR | 1 | 19373 | 19373 |