State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/RC/75 (ग्रेवल मार्ग निर्माण दिनेश सिंह के घर से सुक्‍ख कं)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2012 Work start date : 30/4/2012
Present status : Earthern road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 1/75 Sanction Date : 28/4/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
256000 148000 0 0 0 0 0 148000 0 404000
Financial Sanction Details
Financial\Administrative Sanction No: 1/2 Financial\Administrative Sanction Date 30/4/2012
Fin. Sanc. Amt. (in Rs) NREGA:404000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
404000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)36000.51800
2Contingency11176411764
3Dag-beling-Double spade "v" shaped stroke 100mm deep15000.2300
4Labour only for item no.110611973019730
5Collection of approved soil having CBR not less then 12, including stacking at quarry.236.25229.5454228.825
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2729.254.813100.4
7Transportation of metal 715.566.0647265.93
8Korebandi for consolidation work.-30cm wide and 10cm thick.10001.91900
9Laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1200 mm dia.22.5772.417379
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor249318.5446220.22
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work249367.8169025.4
12SIGN BOARD115001500
13Labour difference in case of old SoR11937319373
Total Activity 404000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work249318.5446220.22
2contangency and work charges124882488
3Display board115001500
4HumePipes22.5722.7116260.975
5Muram231.25120.2427805.5
6Rolling of Soil236.2539.69355.5
7Soil transport715.543.2730959.685
8Trasportaion of water2729.254.813100.4
Total Material 148000