S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 120 | 3.4 | 408 |
2 | Contingency | 1168 | 10 | 11680 |
3 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-250 mm | 8 | 296.9 | 2375.2 |
4 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-300 mm | 4 | 347 | 1388 |
5 | Extra for under-ramming inside the bore holes for under reamed piles.-300mm | 4 | 140.7 | 562.8 |
6 | Dag-beling-Single spade stroke minimum 75mm deep | 120 | 0.2 | 24 |
7 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 8.464 | 121.5 | 1028.376 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 2.5 | 1836.8 | 4592 |
9 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 3.818 | 2921.9 | 11155.8142 |
10 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 2.01 | 2532 | 5089.32 |
11 | False work for R.C.C. and P.C.C. work in plinth and foundation | 21.36 | 125.1 | 2672.136 |
12 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime surkhi mortar 1:1:2 (1lime, 1surkhi, 2sand) | 0.704 | 1477.4 | 1040.0896 |
13 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 457.498 | 49.8 | 22783.4004 |
14 | Labour only for fixing of R.C.C. posts, Angle iron posts or wooden ballies of any size I/c excavation of pit 30x30x30cm And cost of concrete 1:3:6 with 40mm metal excluding cost of posts. | 96 | 48.4 | 4646.4 |
15 | Providing and fixing barbed wire fencing with 5 rows of horizontal barbed wire and 2 digonal rows tightened to RCC post as per IS:4996-1984, 2M long, 1.4 m above and 0.6 m belowe ground level, c/c spacing of each post shall not exceed 3M with diagonal str | 240 | 180.6 | 43344 |
16 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 161.6 | 54 | 8726.4 |
17 | Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick. | 25 | 144.7 | 3617.5 |
18 | Cement washing (Portland cement) 2 coats.-White cement | 161.6 | 9.6 | 1551.36 |
19 | Transportation of sand | 770.3 | 113.56 | 87475.268 |
20 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 28.19 | 167.26 | 4715.0594 |
21 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 770.3 | 19.7 | 15174.91 |
22 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1598.6 | 67.8 | 108385.08 |
23 | Collection of soft moorum including stacking at quarry. | 770.3 | 94.2 | 72562.26 |