Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:26:44 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DEVRIKALA(P)
Work Code: 1703004033/RC/22012034212390 (kharanja nirman main gali se deewan singh ke makan)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 4/3/2014
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 2014/1 Sanction Date : 19/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98408 42377 0 0 0 0 0 42400 0 140785
Financial Sanction Details
Financial\Administrative Sanction No: 33/33 Financial\Administrative Sanction Date 20/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:140785 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
141000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep2000.240
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick140218.630604
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.300215.764710
4Transportation of sand45206.649298.8
5Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.69.92132.849288.1728
6Loading of metal in truck, dumper etc.69.9226.281837.4976
7Unloading of metal in truck, dumper etc.69.9213.14918.7488
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.69.92412866.72
9Collection of hard moorum including stacking at quarry.69.92130.89145.536
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.11207512075
Total Activity 141000
S.NoMaterialQuantityUnit PriceTotal
1Transporation of Boulder45206.649298.8
2खण्‍डा परिवहन148904890
3पत्‍थर फर्सी14013518900
4मुरम परिवहन (1)69.92132.849288.1728
Total Material 42400