State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003050/WC/22012035084961 (STOP DAM NIRMAN KARY ASHARAM KE KHET KE PAS NALA PAR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2023 Work start date : 13/5/2023
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 584/ts Sanction Date : 5/6/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
496000 1984000 0 0 0 0 0 1984000 0 2480000
Financial Sanction Details
Financial\Administrative Sanction No: 2101/as Financial\Administrative Sanction Date 12/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:2480000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
2480000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136823682
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)196.943855.97759394.7318
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)18.763202.6360081.3388
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)606729.58403774.8
5False work for R.C.C. and P.C.C. work in plinth and foundation310.4174.2154074.784
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height45087.1739226.5
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars2499.2169.58173895.0318
8TRANSPORTATION OF MATERIAL1234953234953
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work4704.79156.79737664.0241
10Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)39.46335.8713253.4302
Total Activity 2480000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti252.561400353584
240 MM. Gitti210.111100231121
3CEMENT.225.922224502446.08
4centring492.2154.1475867.708
5HIRE CHARGE OF MIXER MACHINE8488574340
6SAND.208.121600332992
7Transportation charges75.52242169271
8लोहा2524.2496242327.04
9साईनबोर्ड 120002000
Total Material 1984000