Work Code: 1713004007/AV/22012034594183 (वाउण्‍डीवाल निर्माण पूर्व माध्‍यमिक शाला अतरैला)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2021 Work start date : 10/9/2021
Present status : NEW Proposed Status : Constr of GP for community
Tech Sanction Details
Technical Sanction No. : 649/007/2021 Sanction Date : 11/8/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
15000 0 0 0 47000 0 0 47000 0 62000
Financial Sanction Details
Financial\Administrative Sanction No: 12/007/2021 Financial\Administrative Sanction Date 3/9/2021
Fin. Sanc. Amt. (in Rs) NREGA:15000 15th Finance Commission
47000
Scheme 2
0
Scheme 3
0
Total
62000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-200 mm7246.21723.4
2Extra for under-ramming inside the bore holes for under reamed piles.-200mm71521064
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.23488.2697.64
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)2.843665.510410.02
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift5.23182.9956.567
6False work for R.C.C. and P.C.C. work in plinth and foundation8.67138.71202.529
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)0.892428.62161.454
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars200.752.510536.75
915mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)66.5104.86969.2
10White washing whith lime on undecorated wall surfaces (3coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.66.510.3684.95
11Providing and fixing 25mm bore galvanised M.S. tube (medium grade) outlet in cement mortar 1:3 (1cement, 3fine sand) including cutting and making good the wall.5.952578.415341.48
12Transportation of metal 11020010200
Total Activity 62000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount14700047000