S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Tribale janjati | 3576 | 116.381999440716 | 416182.03 |
2 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock.
(Additional lead of 10 m. in tribal / hilly area) | 1420 | 26.9891971830986 | 38324.66 |
3 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 10 m. in other area) | 1065 | 23.4192018779343 | 24941.45 |
4 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 30 m. in tribal / hilly area) | 355 | 72.5257464788732 | 25746.64 |
5 | Additional rate of additional lead by head load for all kind of soil, sand, soft murum, hard murum, stones, pebbles,boulders, rock. (Additional lead of 40 m. in tribal / hilly area) | 710 | 95.2 | 67592 |
6 | Constucting casing or Hearting at embankment site with the following sorts of materials conveyed, removing trees, bushes, grass roots, etc. breaking clods and spreading the same in layers for embankement with earth work and dressing upto required level. (A) For Soil, soft murum and hard murum and boulder materials. For tribal and hilly area | 2662.5 | 10.948 | 29149.05 |
7 | Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area. Additional lift of 1.5 m in tribal / hilly area. | 1050 | 66.164 | 69472.2 |
8 | Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area.
Additional lift up to 3.00 m in tribal / hilly area. | 710 | 95.2 | 67592 |
9 | Extra rate of additional lift of 1.5 m and/or its part for conveying material obtained from all types of strata from pit / borrow area.
Additional lift up to 4.50 m in tribal / hilly area. | 355 | 136.809549295775 | 48567.39 |
10 | Man days for unskilled | 278.29 | 238 | 66233.02 |
11 | Lum sum Material for all works. | 18500 | 1 | 18500 |