S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 99.22 | 882 | 87512.04 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 49.61 | 3307.4 | 164080.114 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 98 | 147.8 | 14484.4 |
4 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 264.6 | 2082.1 | 550923.66 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 588 | 127.6 | 75028.8 |
6 | Transportation of metal | 75.41 | 183.7 | 13852.817 |
7 | Transportation of metal | 115.48 | 288.7 | 33339.076 |
8 | Transportation of sand | 21.31 | 377.7 | 8048.787 |
9 | Transportation rates for Masonry stone. | 264 | 257.18 | 67895.52 |
10 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 32.68 | 177.9 | 5813.772 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 22.185 | 291.3 | 6462.4905 |
12 | SIGN BOARD | 1 | 5000 | 5000 |
13 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 529.2 | 52.7 | 27888.84 |
14 | contingency | 1 | 8669.6835 | 8669.6835 |