S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 78.84 | 3075.6 | 242480.304 |
2 | Labour only for item no. 0413 (for any proportion of cement concrete) | 0 | 0 | 0 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 87.6 | 185.4 | 16241.04 |
4 | Transportation of metal | 6.7 | 138.6 | 928.62 |
5 | Transportation of metal | 74.46 | 46.53 | 3464.6238 |
6 | Transportation of metal | 3.39 | 124.74 | 422.8686 |
7 | Loading of metal in truck, dumper etc. | 74.46 | 28.12 | 2093.8152 |
8 | Unloading of metal in truck, dumper etc. | 74.46 | 42.93 | 3196.5678 |
9 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 438 | 14 | 6132 |
10 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 74.46 | 44.7 | 3328.362 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 8.76 | 50 | 438 |
12 | Collection of soft moorum including stacking at quarry. | 74.46 | 122.81 | 9144.4326 |
13 | Field Technical Supervisior Charge-FTSC | 11224.94 | 1 | 11224.94 |