State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003/RC/22012034640251 (Const. of Khet Sadak / Sudoor Sadak Kusli Walo ke Khet se Sorai Har ki Aur Sigon)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 5/6/2023
Present status : Bitumen Top Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 382/23 Sanction Date : 23/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
2098000 1398000 0 0 0 0 0 1398000 0 3496000
Financial Sanction Details
Financial\Administrative Sanction No: 1646/23 Financial\Administrative Sanction Date 31/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:3496000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3496000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136823682
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.72317.0250761.62
3Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.3287.16213.91703156.3956
4Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural5152.32213.911102132.7712
5Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor5190.9419.31100237.0514
6Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp560292.53163816.8
7Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)56036.6320512.8
8Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau1181.25548.57647998.3125
9Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:262.5468.97123104.625
10Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti40.56178.687247.2608
11Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed7580.33.627289.08
12Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount.72.667513.46545928.0036
Total Activity 3496000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL4585038250
240 M.M. METAL3665023400
3BAJARA415468194220
4boldar26036093600
5cement bag545320174400
6Loosening Machine Rent2580.43.69289.44
7Moorum645548.57353827.65
8roller2580.417.4445002.176
9sand cum1051250131250
10sariya26072.3818818.8
11Transportation charges3001050315000
Total Material 1398000