S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 86.4 | 160 | 13824 |
2 | SIGN BOARD | 1 | 3328 | 3328 |
3 | contingency | 1 | 3443 | 3443 |
4 | Filling of 30x20 cm size polythene bags with filtration of soil and proper mixing of manure and sand etc complete Mandays per Hundred | 520 | 12 | 6240 |
5 | Spraying of insecticids on plants Mandays per hundred. | 520 | 225 | 117000 |
6 | Fencing with spick shrubes minimun 1.6m. height around the plant. | 250 | 221 | 55250 |
7 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 250 | 2.62 | 655 |
8 | Supply of foresty or horticulture Plant cost prepared by seeds 1.5 to 2 feet plant height . | 520 | 38 | 19760 |
9 | Transport of plants from nursury to plantation site upto 40 km. including loading and unloading | 400 | 1.25 | 500 |