State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BARAUA(P)
Work Code: 1703004052/RS/22012034332589 (U SHEP NALI NIRMAN PULIYA KE AAGE SE VISHAL KE KHET KI OR SUKHNAKHIRIYA)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 16/3/2017
Present status : Not Exist Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 52/5029 Sanction Date : 30/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
186947 309053 0 0 0 0 0 310000 0 496000
Financial Sanction Details
Financial\Administrative Sanction No: 52/0016 Financial\Administrative Sanction Date 20/2/2017
Fin. Sanc. Amt. (in Rs) NREGA:496000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
496000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)30.382202.366905.874
2Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used22.783307.475342.572
3Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand)101.252082.1210812.625
4Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing270127.634452
5Transportation of metal 19.3641556.110768.37601
6Transportation of sand66.914165.3311062.89162
7Transportation rates for Masonry stone.101.25394.3839930.975
8Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.27.945197.75524.7265
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13.915184.232563.56045
10Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil196029602
11Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed52.796.25069.74
12contingency123964.6623964.66
Total Activity 496000
S.NoMaterialQuantityUnit PriceTotal
120mm metal19.3641146528368.4065
240 MM Metal supply30197.75931
3Contengency12076520765
4Khanda Praday101.2547648195
5SANT66.91488259018.148
6Transpotation Charges27.945197.75524.7265
7WATER CHANNEL1580012000
8गिट्रटी परिवहन10020520500
9सीमेन्‍ट375290108750
Total Material 310000