State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: BHATI GAWAN
Work Code: 1713003014/AV/22012034542700 (RAPTA NIRMAN TRIVENI NALA ME)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 10/6/2020 Work start date : 2/11/2020
Present status : NEW Proposed Status : Constr of Culvert/cross drainage work for Comm
Tech Sanction Details
Technical Sanction No. : -187. Sanction Date : 30/10/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
34800 0 0 0 152200 0 0 153000 0 187000
Financial Sanction Details
Financial\Administrative Sanction No: *-14/1. Financial\Administrative Sanction Date 9/11/2020
Fin. Sanc. Amt. (in Rs) NREGA:34800 Panchparmeshwar
152200
Scheme 2
0
Scheme 3
0
Total
187000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil24761824
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)153488.252323
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)14.72545.537418.85
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand)76.529.592263.635
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing2478.51884
7Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural15238852388
8Providing and laying in trenches galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings (earth work in trenches to be measured and paid for separately)-80 mm dia.42.48156.36639.624
9Lossening of hard soil by ploughing the existing gound27252.514280
10Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed29252.515330
Total Activity 187000
S.NoMaterialQuantityUnit PriceTotal
1complite materail punch parmes1152615152615
Total Material 153000