Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:22:15 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/RC/22012034227681 (c.c.road pp NREGA rajaram to davmaharaj dangicha)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/5/2014 Work start date : 21/8/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 32/0001 Sanction Date : 11/8/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
102600 67800 0 0 324000 0 0 392000 0 494400
Financial Sanction Details
Financial\Administrative Sanction No: 32/0006 Financial\Administrative Sanction Date 12/8/2014
Fin. Sanc. Amt. (in Rs) NREGA:170400 Panchparmeshwar
324000
Scheme 2
0
Scheme 3
0
Total
495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)121.682762.4336128.832
2Labour only for item no. 0413 (for any proportion of cement concrete)121.68418.350898.744
3False work for R.C.C. and P.C.C. work in plinth and foundation120158.619032
4Deduct for concrete unvibrated in item no. 042510815616848
5Transportation of metal 118.0840.684803.4944
6Transportation of metal 103.4217618201.92
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.52.32158.588296.9056
8Loading of metal in truck, dumper etc.118.0828.263336.9408
9Unloading of metal in truck, dumper etc.118.0814.131668.4704
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.118.0844.15207.328
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work128.1687.311188.368
12Collection of soft moorum including stacking at quarry.118.08121.314323.104
13contingency145504550
Total Activity 495000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL103.4280082736
2CEMENT(BEGS)772280216160
3Centring & Shuttering12095.611472
4contangency and work charges127002700
5sand cum52.3270036624
6Transportaion of muram (trip)118.0840.684803.4944
7Transportaion of sand (Trip)52.32158.588296.9056
8transpotation of matel103.4217618201.92
9Vibrator (Per Day)10810010800
Total Material 392000