State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: Sonud
Work Code: 1725006057/IF/02 (कपिलधारा कूप सह मेढ बंधान कार्य इंदरसिंह ध्‍यानसिं)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/6/2011 Work start date : 19/6/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 0000379 Sanction Date : 17/6/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
100160 49840 0 0 0 0 0 49900 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 00002/213 Financial\Administrative Sanction Date 19/6/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.19421813.98
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil192.19428071.98
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)170927092
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead96.0918.31758.447
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)5.092557.613018.184
6False work for R.C.C. and P.C.C. work in plinth and foundation102128.613117.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14351.77393.1
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.34226.1510253.641
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.168.3408.3168718.573
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work22.6775.31707.051
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work22.6797.82217.126
12work charge11400014000
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod000
220 M.M. METAL7.058505992.5
340 mm Metal000
4Cement36.1231011197.2
5Centring & Shuttering102.27888999.76
6CONTANGANCY3.965001980
7Display board000
8hol137.14709599.8
9IRON SARIYA123.3163.37805.523
10photographs000
11R.R. stone (granite)000
12Sand5.667504245
13Transportation charges000
14xerox000
Total Material 49900