S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 0 | 0 | 0 |
2 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 280 | 25 | 7000 |
3 | contingency | 1 | 2712 | 2712 |
4 | Applying chemicles in soil around plants Mandays per hundred. | 840 | 60 | 50400 |
5 | Layout of Field for per digging of pits for plantation work. | 8000 | 0.5 | 4000 |
6 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 840 | 15 | 12600 |
7 | Supply of vermi compost | 280 | 7.5 | 2100 |
8 | Supply of singal super phosphate (SSP) | 70 | 6.08 | 425.6 |
9 | Supply of muriate of potash (MOP) | 35 | 16.98 | 594.3 |
10 | Supply of urea. | 35 | 6 | 210 |
11 | Supply of Themate, phorate 10 G pesticites | 7 | 65 | 455 |
12 | Supply of foresty or horticulture Plant cost 3 to5 feet . height | 420 | 30 | 12600 |