S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) Lead upto 100 Metres | 1147.49 | 38.8887223418069 | 44624.42 |
2 | (f) C.C 1:2.5:5 ( 1cement, 2.5 sand, 5metal) | 34.44 | 3541.28774680604 | 121961.95 |
3 | Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column | 127.8 | 166.085289514867 | 21225.7 |
4 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 22.5 | 215.943111111111 | 4858.72 |
5 | (b) White cement | 212.5 | 20.6578823529412 | 4389.8 |
6 | (I) 0.5 Km. Lead -- | 1768.82 | 91.7115478115354 | 162221.22 |
7 | (IV) 2.0 Km. Lead | 47.43 | 113.817625975121 | 5398.37 |
8 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2916.31 | 17.4425455455696 | 50867.87 |
9 | (c) Metal 40 mm nominal size | 49.92 | 852.584935897436 | 42561.04 |
10 | (a) Boulders | 146.24 | 598.843476477024 | 87574.87 |
11 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 294 | 452.889795918367 | 133149.6 |
12 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 210 | 169.83 | 35664.3 |
13 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 173.4 | 172.890023068051 | 29979.13 |
14 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2700 | 2.81891481481481 | 7611.07 |
15 | b (iii) Dense or hard soil for Tank Work | 1768.82 | 144.074999151977 | 254842.74 |
16 | c (iii) Hard moorum for Tank Work | 1168.61 | 191.907899128024 | 224265.49 |
17 | (a) Dense or hard soil | 80 | 154.448375 | 12355.87 |
18 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 47.43 | 241.123972169513 | 11436.51 |
19 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 599.04 | 379.205395299145 | 227159.2 |
20 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3682 | 3682 |
21 | Provision for Mate | 36 | 368 | 13248 |