State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PURWA U.310
Work Code: 1713004072/RC/22012034325027 (सुदूर ग्राम संपर्क सडक निर्माण गजेंद्र द्विवेदी के घर से उत्‍त्‍र की तरफ टीएस 1683)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 2/2/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 4072/1683 Sanction Date : 19/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
403000 697000 0 0 0 0 0 697000 0 1100000
Financial Sanction Details
Financial\Administrative Sanction No: 1683/48 Financial\Administrative Sanction Date 20/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:1100000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1100000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises01.60
3Lime Surkhi Mortar 1:1:2 ( 1 lime putty, 1 surkhi, 2sand )117052.761659
4Work charge120002000
5Dag-beling-Single spade stroke minimum 75mm deep30000.3900
6Labour only for 20mm thick cement plaster of any ratio.80001.814400
7Collection of approved soil having CBR not less then 12, including stacking at quarry.35052.718445
8Transportation of metal 2950119351050
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making117021.625272
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor257123.159390.1
11Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)35040.114035
12Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau540.75576.9311958.675
13Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:154.5508.678578.7
14Collection of puddle earth including stacking at quarry257152.7135491.7
15Labour difference in case of old SoR12415124151
Total Activity 1100000
S.NoMaterialQuantityUnit PriceTotal
1Compaction1465000465000
2Display board120002000
3pipe11383613836
4Transportation charges1216164216164
Total Material 697000