S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 34.02 | 224 | 7620.48 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 56.7 | 65.7 | 3725.19 |
3 | Labour only for item no. 0404 | 146 | 299 | 43654 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 15.75 | 3177.8 | 50050.35 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 14.18 | 2478.2 | 35140.876 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 315 | 154.2 | 48573 |
7 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats | 1 | 1000 | 1000 |
8 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 737.1 | 118.8 | 87567.48 |
9 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 12.76 | 330.8 | 4221.008 |
10 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 13.15 | 112.8 | 1483.32 |
11 | Transportation of metal | 26.15 | 161.5 | 4223.225 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 13.15 | 214.5 | 2820.675 |
13 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 737.1 | 104.8 | 77248.08 |
14 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 737.1 | 23.6 | 17395.56 |
15 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 368.55 | 57.7 | 21265.335 |
16 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 0 | 0 | 0 |
17 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 5.67 | 81.2 | 460.404 |
18 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work | 17.01 | 97.7 | 1661.877 |
19 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 2457 | 12.8 | 31449.6 |