S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3530 | 3530 |
2 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 413.82 | 274.36 | 113535.6552 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 1160.86 | 3829.12 | 4445072.2432 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 232.4 | 3175.78 | 738051.272 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 132.12 | 5779.94 | 763645.6728 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 2194.22 | 163.98 | 359808.1956 |
7 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 13000 | 72.27 | 939510 |
8 | Transportation of metal | 8730 | 111.75 | 975577.5 |
9 | Transportation of metal | 1890 | 139.89 | 264392.1 |
10 | Transportation rates for Lime (fat), Hydraulic or any other. | 42 | 572.61 | 24049.62 |
11 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia. | 42 | 3768.21 | 158264.82 |
12 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 5340 | 17.37 | 92755.8 |
13 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 8730 | 24.06 | 210043.8 |
14 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 472.5 | 468.5 | 221366.25 |
15 | Site clearance, cutting grass, raking into heaps and removing off the premises | 30000 | 2.67 | 80100 |
16 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 7162.5 | 136.31 | 976320.375 |
17 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 445.65 | 148.33 | 66103.2645 |
18 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 521.86 | 176.55 | 92134.383 |
19 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 169.32 | 578.78 | 97999.0296 |
20 | Lossening of hard soil by ploughing the existing gound | 8730 | 3.6 | 31428 |
21 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 8730 | 74.83 | 653265.9 |
22 | Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry. | 1134 | 211.55 | 239897.7 |
23 | Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry. | 756 | 185.37 | 140139.72 |
24 | Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount. | 1890 | 132.04 | 249555.6 |
25 | Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete. | 1890 | 36.06 | 68153.4 |
26 | FTSC- Field supervision charges | 1 | 151000 | 151000 |