S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 65.87 | 127.23 | 8380.6401 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 200 | 36.6 | 7320 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 5.5 | 2557.6 | 14066.8 |
4 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 88 | 155.9 | 13719.2 |
5 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 150 | 51.7 | 7755 |
6 | Rewedging cramping joinery of any description with new wedges in glue or white lead and repining including rehanging or refixing of shutters, hinges or pivots excluding removing or dismantling.-Not exceeding 1sqm per leaf of soft wood | 80 | 30 | 2400 |
7 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 38.41 | 75.3 | 2892.273 |
8 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum | 57.22 | 97.8 | 5596.116 |
9 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 31.79 | 221.7 | 7047.843 |
10 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited) | 164 | 450.45 | 73873.8 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 40 | 74.9 | 2996 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work | 40 | 76.3 | 3052 |