Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:50:21 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/RC/22012034187834 (खरंजा निर्माण हैण्‍डपम्‍प से सिरनाम सिह बघेल के घर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 30/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 1873 Sanction Date : 20/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
81539 42652 0 0 0 0 0 42700 0 124191
Financial Sanction Details
Financial\Administrative Sanction No: 74/189 Financial\Administrative Sanction Date 21/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:124191 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
125000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency15912.15912.1
2Dag-beling-Single spade stroke minimum 75mm deep1900.238
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.285215.761474.5
4Stacking without boxing.-Puddle earth, moorum, sand or kankar87.6410.5920.22
5Transportation rates for Masonry stone.42.75453.0419367.46
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.87.64191.1616753.2624
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.76.95413154.95
8Collection of hard moorum including stacking at quarry.87.64130.811463.312
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.39912.85107.2
Total Activity 125000
S.NoMaterialQuantityUnit PriceTotal
1contangency11531.271531.27
2PhotoCopy & Stationary110001000
3sign board140004000
4खण्‍डा परिवहन42.75453.0419367.46
5मुरम परिवहन (1)87.64191.1616753.2624
Total Material 42700