Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:00:28 AM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003040/IF/22012034556656 (कपिलधारा कूप निर्माण सुंदर पाल पिता झुरा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2020 Work start date : 16/5/2020
Present status : Not Exist Proposed Status : Bondry Block - Coastal Shelter Belt-Individuals
Tech Sanction Details
Technical Sanction No. : 1711003/2020-2021/122561/TS Sanction Date : 17/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
168708.43 81271.7 79700.93 653.17 0 0 0 162000 0 330334.23
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2020-2021/122561/AS Financial\Administrative Sanction Date 17/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:330499 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
331000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.0857.60809390329363288.27
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)2.583156.918604651168144.85
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.953904.307692307697613.4
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)6.195279.5201938610732680.23
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars330.5171.763910320413923718.69
6(XVII) 14 Km. Lead5.97267.7453936348411598.44
7(X) 5.0 Km. Lead9194.3666666666671749.3
8(X) 5.0 Km. Lead9152.1133333333331369.02
9(XVII) 14 Km. Lead2.32240.715517241379558.46
10(XXXI) 70 Km. Lead5.34641.0149812734083423.02
11(XVII) 14 Km. Lead0.35241.14285714285784.4
12(b) Dense or hard soil60.24148.7749003984068962.2
13(I)1.50 m. to 2.00 m.20.18201.5891972249754068.07
14(II)2.00 m. to 2.50 m.20.18211.6580773042624271.26
15(XVIII)10.00 m. to 10.50 m.7.26750.6942148760335450.04
16(XIX)10.50 m. to 11.00 m.7.26773.9779614325075619.08
17(XX)11.00 m. to 11.50 m.6.92798.0534682080925522.53
18(XXI)11.50 m. to 12.00 m.6.92821.3598265895955683.81
19(XXII)12.00 m. to 12.50 m.6.92844.6676300578045845.1
20(XXIV)13.00 m. to 13.50 m.6.92891.283236994226167.68
21(XXVI)14.00 m. to 14.50 m.6.92937.8973988439316490.25
22(XXVII)14.50 m. to 15.00 m.6.92961.2052023121396651.54
23(XXIX)16.00 m. to 16.50 m.6.921007.820809248556974.12
24(III)2.50 m. to 3.00 m.20.18497.76114965312210044.82
25(XXXI)17.00 m. to 17.50 m.6.921054.434971098277296.69
26(X)6.00 m. to 6.50 m.8.67830.2675893886977198.42
27(XI)6.50 m. to 7.00 m.8.67848.431372549027355.9
28(XII)7.00 m. to 7.50 m.8.31866.0746089049347197.08
29(XIII)7.50 m. to 8.00 m.8.31884.2274368231057347.93
30(XIV)8.00 m. to 8.50 m.7.95902.6968553459127176.44
31(XV)8.50 m. to 9.00 m.7.95920.855345911957320.8
32(XVI)9.00 m. to 9.50 m.7.6939.1276315789477137.37
33(XVII)9.50 m. to 10.00 m.7.6957.2894736842117275.4
34(XXIII)12.50 m. to 13.00 m.6.921092.680635838157561.35
35(XXV)13.50 m. to 14.00 m.6.921139.296242774577883.93
36(XXVII)14.50 m. to 15.00 m.6.921185.910404624288206.5
37(XXVIII)15.50 m. to 16.00 m.6.921209.218208092498367.79
38(XXX)16.50 m. to 17.00 m.6.921255.83236994228690.36
39(XXXII)17.50 m. to 18.00 m.6.921302.447976878619012.94
40(IV)3.00 m. to 3.50 m.9.81737.563710499497235.5
41(V)3.50 m. to 4.00 m.9.81752.5219164118257382.24
42(VI)4.00 m. to 4.50 m.9.42767.5700636942687230.51
43(VII)4.50 m. to 5.00 m.9.42782.5297239915077371.43
44(VIII)5.00 m. to 5.50 m.9.04797.414823008857208.63
45(IX)5.50 m. to 6.00 m.9.04812.372787610627343.85
46Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9161.0255555555561449.23
47Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9224.5766666666672021.19
48Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12249.422249.42
Total Activity 331000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.0795885955.3575
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.744622421669.3932
30297-Stone Aggregate(single size): 10 mm nominal size1.5756630992.628
40325-Blasting powder36.311552.491905.990635
50326-Blasting fuse (fuse wire)39.59214.51574.47992
60367-Portland Cement3.2121551117701.8831
70368-White cement 0.0002157443.1488
80983-Fine sand (zone IV)4.91091076.255285.356125
91005-Twisted steel/deformed bars3.4704542818837.3312
101235-Diesel oil9.425568640.934
115001-Mobil oil0.3339182.961.07031
127335-Binding wire3.305155.58183.697458
137900-Modular common burnt clay bricks of class designation 7.5150.84.13622.804
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.7277525907.0425
15MR6007-Hier Charges for Centering6.1878004949.6
16MR6032-Snowcem/ durocem0.00042778911.1156
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)6.22626824246.2684
Total Material 59600