State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: KHARHARI
Work Code: 1713004011/RC/22012034215004 (Ts no 2115 खेत सडक देवास गंगेव पहुच मार्ग से रामबह)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 25/3/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 2115/11 Sanction Date : 26/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
550000 350000 0 0 0 0 0 350000 0 900000
Financial Sanction Details
Financial\Administrative Sanction No: 006/11 Financial\Administrative Sanction Date 28/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:900000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
900000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep48000.2960
2Transportation of metal 1885114.1215078.5
3Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making188521.540527.5
4Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor18852343355
5Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)1141000141000
6Site clearance, cutting grass, raking into heaps and removing off the premises76001.612160
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.220960.2132981.8
8Collection of puddle earth including stacking at quarry1104112.8124531.2
91902 Transportion of metal900208.4187560
10SIGN BOARD115001500
Total Activity 900000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of GSB50019.119555
2Compaction of Selected soil50019.119555
3contangency and work charges160006000
4HumePipes2540010800
5Transportanion of hard Muram100391.1139111
6Transportanion of Soft Muram600165.1199066
7Transportation of embankment s240063.27151848
8Water With Tenkar120019.923880
Total Material 350000