S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 7000 | 3 | 21000 |
3 | Transportation of metal | 0 | 92.16 | 0 |
4 | Transportation of metal | 0 | 99.27 | 0 |
5 | Transportation of metal | 330 | 139 | 45870 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 914 | 18.4 | 16817.6 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 2083 | 24.7 | 51450.1 |
8 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp | 1 | 100000 | 100000 |
9 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 1 | 50000 | 50000 |
10 | Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau | 1 | 37800 | 37800 |
11 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 1 | 78800 | 78800 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0.7 | 5933 | 4153.1 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 0.7 | 7462 | 5223.4 |
14 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 0.7 | 3074 | 2151.8 |
15 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 4 | 1135 | 4540 |
16 | Collection of soft moorum including stacking at quarry. | 10 | 230 | 2300 |
17 | Lossening of hard soil by ploughing the existing gound | 3228 | 2.7 | 8715.6 |
18 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 2770 | 2.7 | 7479 |