Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:40:01 AM 
Back  
State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: JIWAR
Work Code: 1713003015/RC/22012034327160 (Sudoor Sadak Main raod se harda fouj ghar tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/4/2016 Work start date : 14/2/2017
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1953/15.. Sanction Date : 6/2/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
139000 299000 0 0 0 0 0 299000 0 438000
Financial Sanction Details
Financial\Administrative Sanction No: 96/15.. Financial\Administrative Sanction Date 7/2/2017
Fin. Sanc. Amt. (in Rs) NREGA:438000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
438000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises7000321000
3Transportation of metal 092.160
4Transportation of metal 099.270
5Transportation of metal 33013945870
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making91418.416817.6
7Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact208324.751450.1
8Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp1100000100000
9Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)15000050000
10Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau13780037800
11Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:17880078800
12Site clearance, cutting grass, raking into heaps and removing off the premises0.759334153.1
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.0.774625223.4
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.0.730742151.8
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil411354540
16Collection of soft moorum including stacking at quarry.102302300
17Lossening of hard soil by ploughing the existing gound32282.78715.6
18Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed27702.77479
Total Activity 438000
S.NoMaterialQuantityUnit PriceTotal
120 mm -  M.S. rod615009000
240 mm Metal25115028750
3Cement12530037500
4Compaction12000020000
5hume pipe43886.815547.2
6Loosening Machine Rent20002.75400
7Moorum1100000100000
8transportion22000040000
9रेत11.02160017632
10रोलर10250025000
Total Material 299000