S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 553.2 | 80.2 | 44366.64 |
2 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Loose or soft soil | 651.23 | 44.6 | 29044.858 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 300 | 0.5 | 150 |
4 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 45.9 | 638.8 | 29320.92 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 45.9 | 3194.2 | 146613.78 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 45.9 | 118.6 | 5443.74 |
7 | Extra rate for laying cement concrete in or under water or liquid mud including cost of pumping and bailing out and removing slush etc. complete. | 220.264 | 68.1 | 14999.9784 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 56.7 | 132.5 | 7512.75 |
9 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 178 | 6.3 | 1121.4 |
10 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 45.9 | 41.2 | 1891.08 |
11 | Transportation of metal | 39.02 | 1749.15 | 68251.833 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 45.9 | 88.4 | 4057.56 |