S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 3.84 | 58.5182291666667 | 224.71 |
2 | (a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.07 | 3714.28571428571 | 260 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 0.28 | 3124.92857142857 | 874.98 |
4 | (b) 40 mm thick | 1.44 | 302.319444444444 | 435.34 |
5 | (i) Cement mortar 1:5 (1cement, 5sand) | 1.05 | 3949.39047619048 | 4146.86 |
6 | (b) Cement mortar 1:4 (1cement, 4sand) | 5.46 | 154.608058608059 | 844.16 |
7 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .
(a) 40 mm nominal size | 1.28 | 538.6796875 | 689.51 |
8 | (f) 3.0 Km. Lead | 1.28 | 144.09375 | 184.44 |
9 | (IV) 2.0 Km. Lead | 1.28 | 142.796875 | 182.78 |
10 | (VI) 3.0 Km. Lead | 1.28 | 125.90625 | 161.16 |
11 | b (iii) Dense or hard soil for Tank Work | 4.22 | 136.369668246446 | 575.48 |
12 | c (iii) Hard moorum for Tank Work | 1.42 | 181.69014084507 | 258 |
13 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 1.28 | 163.5703125 | 209.37 |
14 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 1.28 | 228.125 | 292 |