Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:20:28 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: TIKURI -32
Work Code: 1713004067/LD/22012034271755 (खेल मैदान माध्‍यमिक पाठशाला टिकुरी 32 के प्रांगण में टीएस 201)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2016 Work start date : 11/5/2016
Present status : Existing Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 4067/201 Sanction Date : 6/5/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
177000 173000 0 0 0 0 0 173000 0 350000
Financial Sanction Details
Financial\Administrative Sanction No: 201/57 Financial\Administrative Sanction Date 10/5/2016
Fin. Sanc. Amt. (in Rs) NREGA:350000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
350000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises29251.85265
2Work charge147004700
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil175569.9122674.5
4Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height30063.619080
5Transportation of metal 702102.6972088.38
6Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor17552340365
7Collection of hard moorum including stacking at quarry.292.5269.8278922.35
8Labour difference in case of old SoR162806280
Total Activity 350000
S.NoMaterialQuantityUnit PriceTotal
1Contengency120002000
2Rolling of Muram14054040540
3steel work11908019080
4Transpotation Charges16652466524
5मिटटी परिवहन14441544415
Total Material 173000