S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2925 | 1.8 | 5265 |
2 | Work charge | 1 | 4700 | 4700 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 1755 | 69.9 | 122674.5 |
4 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 300 | 63.6 | 19080 |
5 | Transportation of metal | 702 | 102.69 | 72088.38 |
6 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1755 | 23 | 40365 |
7 | Collection of hard moorum including stacking at quarry. | 292.5 | 269.82 | 78922.35 |
8 | Labour difference in case of old SoR | 1 | 6280 | 6280 |