State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Narayanpura
Work Code: 1722005011/RC/22012034560250 (Khet Sadak Niraman Pawan Salunke ke Khet se Suresh Bhikaji ke Khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/9/2020 Work start date : 15/2/2021
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 1722005/2020-2021/49880/TS Sanction Date : 18/2/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
754167.01 733363.51 1252.62 5015.32 0 0 0 740000 0 1493798.46
Financial Sanction Details
Financial\Administrative Sanction No: 1722005/2020-2021/49880/AS Financial\Administrative Sanction Date 18/2/2021
Fin. Sanc. Amt. (in Rs) NREGA:1494088 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(XX) 20 Km. Lead165320.24290909090952840.08
2(I) 0.5 Km. Lead --420.7589.443303624480137633.27
3(XV) 10 Km. Lead2813.25209.742187861015590057.21
4Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Technical Specification Clause 401 of Specification for Rural Roads.i/c all leads of water etc. complete.742.562.520740740740746421.65
5(a) 900 mm dia.6.53185.4292307692320705.29
6(d) 600 mm dia.141675.9814285714323463.74
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.145217.350110192837525192.36
8Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.2235.7523.942529352566353529.51
9Setting out work (Reference pillars, referencing bench mark and temporary bench mark):- Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interval made of 1:3:6 cement concrete i/c excavation of 30x30x30 cm pit and providing and fixing of Reference pillars made of cast in situ or pre cast RCC pole,1.50m long having dimensions as100x100mm at top and 150x150mm at bottom with 4 no. 8mm dia. bars in longitudinal direction and 6mm dia. stirrups at 300mm c/c spacing - made in cement concrete M-15, or finished stone posts 1500 x200x75 mm size embedded in 30x30x45 cm cement concrete 1:3:6 i/c excavation and casting etc. complete, @ 100 m interval or as required on both sides of the formation width preferably at 5.50 m distance from centre line.1.16828.818181818187511.7
10Survey and investigation and preparation of DPR for road work with chain and compass, auto level, theodolite or total station i/c fixing of permanent benchmark and also fixing of bench mark on all the permanent structures, along the alignment, like boundary wall,electrical poles etc. Also marking of locations of boundary wall,electric poles, telephone poles trees etc. in the road boundary, collection and submission of existing inventory of the road all along the alignment conducting survey@20 metre interval for L-section and for single lane X-section interval will be @ 0.75, 1.25, 1.875, 2.60, 3.75, 4.50, 5.50 and 6.50 metre on both side of centre line for two lane four lane interval for x-section shall be as specified in MORT&H/MoRD Specifications. (FOR LABOUR ONLY IN SURVEYING )1.1692.118181818182761.33
11(A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast)21607.463214.92
12(A) With Reinforced cement concrete (iii) 200 m stone (precast)4488.29751953.19
13Site clearance, cutting grass, raking into heaps and removing off the premises93502.625457754010724548.03
14(b) Dense or hard soil1031.25146.027539393939150590.9
15Collection/Excavation of Graval Material meeting the requirements of Hard Moorum as detailed in RES SOR chaper 03 Notes Clause 3.2© including stacking and all leads and lifts up to loading point at quarry.577.5208.258995670996120269.57
16Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.165182.4950303030330111.68
17Spreading of material, mixing by mix in place method by manual means or by Tractor mount disk herrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2, 2.2.2.3, 2.2.3.1 and 2.2.3.2 of IRC:SP:77-2008. and grading by tractor mount grader to get the required profile.742.5129.85682154882296418.69
18Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.2656.53.600180688876349563.88
19Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.2656.573.6689403350273195701.54
20Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13603.483603.48
Total Activity 1495000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.171885151.335
20038-Tractor with ripper attachment9.334212419825.416
30055-Smooth Wheeled Roller 8 to 10 tonne131.796223631103.9032
40057-Water Tanker 5 to 6 KL Capacity87.367511810309.365
50084-Hire charges of Diesel truck - 9 tonne (without POL)12.4421224227895.1882
60297-Stone Aggregate(single size): 10 mm nominal size0.080363050.589
70367-Portland Cement0.537955112964.3669
80368-White cement 0.0004157446.2976
90763-Glue 2.3757.9518.88125
100830-Enamel paint2.0374160.13326.248862
110982-Coarse sand (zone III)0.0561028.1657.57696
120983-Fine sand (zone IV)0.83461076.25898.23825
131005-Twisted steel/deformed bars0.1295428700.212
141235-Diesel oil109.4376687441.7568
155001-Mobil oil3.9469182.9721.88801
167335-Binding wire0.122955.586.830782
177900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
18MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.0166525533.715
19MR6032-Snowcem/ durocem0.00072778919.4523
20MR6039-Water5242050.0526210.25
21MR6041-RCC NP-3 pipe 600mm(based on LUN rate)141235.5617297.84
22MR6042-RCC NP-3 collar 600mm(based on LUN rate)4.2177.78746.676
23MR6043-RCC NP-3 pipe 900mm(based on LUN rate)6.52488.8916177.785
24MR6044-RCC NP-3 collar 900mm(based on LUN rate)1.95266.02518.739
25MR6072-RCC fencing post of CC M20 , 1.85 Mtre long (125MMx125MM bottom & 85MMx85MM top ) (125MM bottom & 85MMx85MM top )22137.383022.36
26MR6073-Lime (Katni)0.044688.830.3072
27MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.3958682269.9356
28MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver11.95427088463.5736
29MR6091-WOOD-Kail wood 2nd class0.003515825.655.3896
Total Material 177000