S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2565 | 3.6792007797271 | 9437.15 |
2 | Hard/ Dense Soil : | 2378.25 | 63.7216987280563 | 151546.13 |
3 | Hard/ Dense Soil : | 153.9 | 66.685510071475 | 10262.9 |
4 | Supplying & stacking at quarry/source of screened shingles on gravel (for light wearing surface) of the following sizes:- | 237.6 | 338.329966329966 | 80387.2 |
5 | Spreading & levelling to gradient & required camber shingle/gravel without power roller: | 342 | 80.8621052631579 | 27654.84 |