State: PUNJAB District: PATIALA Block: RAJPURA Panchayat: MAMOLI
Work Code: 2609005095/WH/9989019382 (Renovation of pond at village mamoli 2022-23)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2022 Work start date : 10/5/2022
Present status : Silted Proposed Status : Renovtion of Community Ponds for Comm
Tech Sanction Details
Technical Sanction No. : 2609005/2022-2023/4671/TS Sanction Date : 4/5/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
443348.67 49781.71 0 0 0 0 0 49800 0 493130.38
Financial Sanction Details
Financial\Administrative Sanction No: 2609005/2022-2023/4671/AS Financial\Administrative Sanction Date 15/5/2022
Fin. Sanc. Amt. (in Rs) NREGA:493127 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
494000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Supplying and planting permanent trees including digging of earth pits size 75cmx75cmx75 cm deep, refilling the excavated earth with manure supplied @ 0.113 cum each and watering Supplying through tractor tanker.50414.37120718.55
2Maintenance of Tree for One year as per Maintenance Norms fixed for Punjab Model under (MGNREGA)50273.427213671.36
3Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (ii) 1.5meter vertical lift and 30meter horizontal lead1795.5184.008983570036330388.13
4Cleaning of silt/sand from drinking water tank/canal/ponds. (b) 1.5 meter vertical lift and 30 meter horizontal lead.769.5114.74887589343788299.26
5Cleaning of jalkhumbi ( Pistia Stratiotes). (10.3) upto 30cm size cleaning of without marsh/mud (pond307812.037309941520537050.84
Total Activity 491000
S.NoMaterialQuantityUnit PriceTotal
13-Display Board130003000
2MR14001-Supply of insecticide chlorpyriphos . per pit2.5377.6944
3MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm.5094.54725
4MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size.501306500
5MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours. Item does not existed in csr 20200.200
6MR1791-Supplying of farm yard manure duly screened and stacked at site of work.62951770
7MR1792-Loading /Unloading charges649.65297.9
8MR1793-Carriage of manure 5 km lead6182.41094.4
9MR1794-Preliminary watering Charges 5 cm. layer over the surface .Rate for 100 liter = 0.45200.459
Total Material 18400