S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4500 | 1.6 | 7200 |
3 | Contingency | 1 | 13302 | 13302 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 376.8 | 0.2 | 75.36 |
5 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 1130.4 | 145.4 | 164360.16 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 13.5 | 3089.9 | 41713.65 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 13.5 | 169.4 | 2286.9 |
8 | Steel work in built up tubular trusses including cutting, hoisting, fixing in position, welded and bolted including special shaped washers etc. complete of Mild steel tubes, electric resistant or induction butt welded | 145 | 52.3 | 7583.5 |
9 | TRANSPORTATION OF MATERIAL | 1 | 195000 | 195000 |
10 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 2400 | 10.2 | 24480 |