S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 42 | 54.4 | 2284.8 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 87.5 | 131.4 | 11497.5 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 54.25 | 3057.7 | 165880.225 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 61.25 | 2228.1 | 136471.125 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 71.2 | 126.6 | 9013.92 |
7 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 10.5 | 2113.1 | 22187.55 |
8 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 70 | 96.4 | 6748 |
9 | Transportation of metal | 101.23 | 387.3 | 39206.379 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 22.09 | 4 | 88.36 |
11 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 10.5 | 681.3 | 7153.65 |
12 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 59.27 | 665.37 | 39436.4799 |
13 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 560 | 9.3 | 5208 |
14 | Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Vitreous China 450 mm x 300 mm x 150 mm size | 12 | 90.3 | 1083.6 |
15 | Collection of hard moorum including stacking at quarry. | 87.5 | 348.02 | 30451.75 |
16 | contingency | 1 | 14340 | 14340 |
17 | Labour difference in case of old SoR | 796 | 10 | 7960 |