S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2000 | 1.5 | 3000 |
3 | Contingency | 1 | 5000 | 5000 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 1361.769 | 65 | 88514.985 |
5 | Dag-beling-Single spade stroke minimum 75mm deep | 399.12 | 0.2 | 79.824 |
6 | TRANSPORTATION OF MATERIAL | 478.94 | 172.15 | 82449.521 |
7 | Collection of quarried stone or rubble.-Maximum size 0.014 cum | 478.94 | 110.6 | 52970.764 |
8 | Labour only for item 2310 | 478.94 | 236.6 | 113317.204 |
9 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 26.63 | 90.1 | 2399.363 |
10 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 115 | 89.6 | 10304 |