State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/RC/22012034210058 (खेत सडक रोड निर्माण काय्र - विश्‍म्‍भर सिंह के खेत)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 12/1/2014 Work start date : 2/3/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 12405 Sanction Date : 6/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
655000 844000 0 0 0 0 0 844000 0 1499000
Financial Sanction Details
Financial\Administrative Sanction No: 14/66 Financial\Administrative Sanction Date 8/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1499000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1499000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises62801.59420
2Contingency000
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.61.21131.48042.994
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)28.462995.885260.468
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)3.62250.98103.24
6False work for R.C.C. and P.C.C. work in plinth and foundation58.75132.37772.625
7Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats1088.9889
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 481911.756382.3
9Transportation of metal 199881.24162317.52
10Transportation of 20 MM metal28.02512.6314363.8926
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.1674153.99257779.26
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.135252.6234103.7
13Transportation of sand15.26320.254887.015
14Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.6.73330.242222.5152
15Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.180008000
16Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.54032.417496
17Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN54084.845792
18Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.52427.118203.25
19Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making232121.650133.6
20Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor240323.355989.9
21Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:71.25381.927210.375
22Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2656.6773.4194999.578
23Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.5898449476
24Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti67.3591.96189.465
25Collection of hard moorum including stacking at quarry.2538118.3300245.4
26SIGN BOARD159995999
27Labour difference in case of old SoR32152167515
Total Activity 1499000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi11200012000
220 MM Graded Metal48.44120058128
340 mm Metal6.5610506888
4BGSY Information Board in Ceme159995999
5Cement388280108640
6Centering and Shuttering111.4680.99017.114
7Compaction of Earth Work160021.634560
8Compaction of GSB167440.868299.2
9construcation of hard shoulder199823.346553.4
10HumePipes153390.650859
11Kilometre Stone (200 M)2254900
12km stone55021100
13Sand for filling and road blin75022.316725
14Transportation of GSB1380171.7236946
15Transportation Of Selected Soi1600116.87186992
Total Material 844000