State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BHOJAKHEDI
Work Code: 1725006011/WC/22012034573133 (निस्तार तालाब निर्माण कार्य रामचरण के खेत के पास सुरगाँवराठौर (भोजाखेड़ी))
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2020 Work start date : 30/7/2020
Present status : Existing Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1725006/2020-2021/301911/TS Sanction Date : 8/8/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
779535.46 378684.52 23651.82 1009.16 0 0 0 404000 0 1182880.96
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2020-2021/301911/AS Financial\Administrative Sanction Date 8/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:1182883 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1183000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 1.50 m. to 3.00 m.575.259.764102564102565616.8
2(II) 3.00 m to 4.50 m1831.217.131313.52
3(d) 2.0 Km. Lead575.25127.2519774011373201.7
4(f) 3.0 Km. Lead1831.23143.389896408425262579.88
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.1831.2317.345139605620331762.94
6(a) Boulders15566.3506666666678495.26
7For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc.249.75421.809129129129105346.83
8Site clearance, cutting grass, raking into heaps and removing off the premises56002.6254571428571414702.56
9b (iii) Dense or hard soil for Tank Work701.5134.18749821810494132.53
10c (iii) Hard moorum for Tank Work1915.48178.737752417149342368.59
11a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work238.25567.183168940189135131.39
1222cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum225347.70102222222278232.73
Total Activity 1183000
S.NoMaterialQuantityUnit PriceTotal
10038-Tractor with ripper attachment2.508821245328.6912
20055-Smooth Wheeled Roller 8 to 10 tonne22.89042365402.1344
30057-Water Tanker 5 to 6 KL Capacity36.62461184321.7028
40084-Hire charges of Diesel truck - 9 tonne (without POL)79.23692242177649.1298
51158-Stone for pitching 15 cm x 22.5 cm67.531521262.5
61235-Diesel oil626.62996842610.8332
75001-Mobil oil22.5275182.94120.27975
8MR6039-Water219747.60.0510987.38
9MR6101-Boulder - picked up (1807)151472205
Total Material 274000